Télécharger Imprimer la page

Inforad M-1 Guide De Démarrage Rapide page 8

Masquer les pouces Voir aussi pour M-1:

Publicité

Les langues disponibles

Les langues disponibles

(d)
Docking station power cable (5) :
INFORAD requires an electrical power source of 5 to 24 V (400mW) provided through the
cable (5). Fit the red cable to the positive and the black cable to the negative or earth.
IMPORTANT: In the event that you fit the power cable directly to the bike's battery, always
disconnect the INFORAD processor to avoid discharging it.
4 • Starting your INFORAD
Once the INFORAD processor (2) is connected to the docking station (1), the LED lamp (4) will start
flashing green. This tells you that the device is on and the process of 'satellite capture' has started.
This process, depending on the line of sight with the satellite network, will take from between 1 and
5 minutes. The presence of tall buildings or tree cover will delay the satellite capture process. Once
sufficient satellites have been captured (a minimum of 3 are required for operation), the LED lamp
will emit a constant green light.
Visual warning signals
Lamp colour
Flashing green
Fixed green
Flashing orange
Fixed red
Flashing red
6
© INFORAD Ltd 2005 - Quick Start guide v1.2
Meaning
Device not yet operational, searching for satellites.
INFORAD is operational.
User defined danger zone (Point of Interest)
approaching.
Warning – Approaching speed camera.
Warning – Speed exceeds authorised limit.

Publicité

loading