1
1
Safety information
Read these instructions carefully before assembly. The complete
station may only be assembled and commissioned by approved
specialist companies. Familiarize yourself with all the parts and
how to use them before starting the work. Follow these safety in-
structions precisely to rule out hazards and damage for both peo-
ple and objects.
The installation site must be protected from frost and easily ac-
cessible. The installation site/room must comply with the regional
and local fire-protection requirements.
2
Description Victaulic
Victaulic connection technology has been established as a sys-
tem for a long time and is used mainly in plant engineering. It
stands out in particular through its quick and easy assembly.
Once assembled, the Victaulic coupling meshes with the beads
in the pipe. The pressure-reacting C-shaped seal adapts to the
standard-roll or mill-grooved pipe. All supplied couplings come
with a seal approved for domestic hot water systems (up to
110 °C).
Always read the installation instruction before installing the Vic-
taulic couplings and accessories.
The installation manual is available from Victaulic or on the Inter-
net at www.victaulic.com.
E-2
1.1 Regulations / directives
Comply with the valid accident prevention regulations, environ-
mental regulations and legal requirements for assembly, installa-
tion and operation. The current valid regulations of DIN, EN,
DVGW,VDI and VDE (incl. lightning protection), as well as all
current relevant country-specific standards, laws and directives.
1.2 Prior to commissioning
Check the goods for completeness, record any transport damage
and other causes for complaint immediately in writing and inform
us before carrying out assembly!
Failure to do so makes any warranty claims for resulting damage
or incorrect function null and void.