Télécharger Imprimer la page

Tabuchi Electric EHW-S55P3B-PNUS Manuel D'installation page 35

Onduleur solaire hybride
Masquer les pouces Voir aussi pour EHW-S55P3B-PNUS:

Publicité

Les langues disponibles

Les langues disponibles

① Confirm that grid-tied operation has been manually stopped.
② Press the [RUN/STOP] button on the Remote Controller to start grid-tied operation.
The status lamp lights a green color and "GRID-TIED MODE" will be displayed.
③ Confirm the storage battery charge on the Remote Controller.
The value should be around 1.4kW charging.
④ Press the measurement unit switching button on the Hybrid Solar Inverter sensor display to switch the measurement
unit to "kW" .
⑤ Confirm that the measured value on the sensor display is greater than the storage battery charge on the Remote
Controller.
Value should be around 1.6kW.
⑥ If the displayed value is different, reattach the reverse power flow CT as explained in the table on the next page.
⑦ Press and hold the [RUN/STOP] button for 5 seconds or more to stop the grid-tied operation.
"MANUAL GRID STOP" will be displayed and the status lamp will turn off.
Measurement Units
Sensor CH
Sensor M
Measured Value
Sensor Channel Selector Button
(Not used)
Setting Button
(Not used)
Hybrid Solar Inverter Sensor Display
Measurement Unit Selector Button
35

Publicité

Chapitres

loading

Produits Connexes pour Tabuchi Electric EHW-S55P3B-PNUS