Commissioning, measuring, calibration
Smallest allowed bend radius
Commissioning
14
Connection cabel
Diameter
Plug type
Accuracy of the IDS measuring technique
Measured parameter
pH
U [mV]
T [°C]
Commissioning, measuring, calibration
Prepare the electrode for measuring as follows:
•
Remove the watering cap from the electrode tip. Possible salt deposits in the
area of the watering cap do not affect the measuring characteristics and can
easily be removed with deionized water.
•
Open the refi lling opening for the reference electrolyte solution
(except ScienceLine A7780 IDS).
The refi lling opening must always be open during calibration and
Measurement!
1
2
Fixed installation: 20 mm
Accuracy (± 1 digit)
refi lling opening
4,3 mm
Flexible use:60 mm
Socket, 4 pins
± 0.004
± 0,2
± 0.1
T 814254
ScienceLine
05/2014