Ferroli VF Instructions De Montage page 27

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 33
VF
10 N/m
4 - Insert the first two clamps inside the profiles and position the M8X75
hex. socket screws on the first hole.
IMPORTANT: Tighten the screws until the profile is secured on the
clamps, so as the eliminate any play.
Solar Panel
Fixing CLIP
6 - Insert the pipe connection, making sure to lubricate the O-rings,
in the collector.
Insert the fixing clips in the special seat on the unions.
A
A
41 mm
8 - Position the next collector, making sure to properly insert the
corrugated connection pipes and align it with the previous collector,
maintaining a distance of 41mm.
Insert the fixing clip in the special seat on the plastic unions of the
second collector.
Fix the remaining collectors, repeating the operations given in
points 7-8.
4
O-Rings
already fi tted
Code 072170X0
A
Cod. 3540S892 - 01/2010 (Rev. 00)
A
B
5 - Carefully place the collector, making sure it is resting on the clamps
and the safety devices (fig. A).
Insert the second pair of grippers and fit them exactly in the cavity
in the sides of the collector.
A
6
10 N/m
7 - Insert the other clamps necessary for fixing the next collector.
8
A
TO FIX
(MAX 25N/m)
B
9 - Tighten and check all the clamps.
A-B
C
C
A
B
EN
5
7
9
27

Publicité

Table des Matières
loading

Produits Connexes pour Ferroli VF

Table des Matières