4.
Insert the shorter bolts (from sachet B) through the locking parts.
11
5.
Connect the tubes using two long bolts from sachet B.
6.
Secure the bolts by turning them clockwise using Allen key # 6. Use ring/open-ended
spanner 13 to secure the nut.
14
Tip
Keep a space of about 5-10mm between the two tubes. This will give you more flexibility
later in the assembly process.
50
12
13