Periodic Maintenance Work; Drainage And Dismantling - IVT LATENTO XP 300 Notice De Montage

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

8. Periodic maintenance work

The LATENTO XP is very easy to maintain. The only periodic work would be
checking the water level and the system pressures.
Half-yearly
Check the water level in the LATENTO XP. The float must be between "Min" and
"Max". Ideal ist the middle position "OPT". When required, refill the storage
tank, as on page 23 described.
Check the system pressure of the solar, boiler and heating system – correct
pressure appropriately, whenever required.

9. Drainage and dismantling

Caution
Risk of scalding. Before dismantling, please see that the
LATENTO XP is off power and the storage water is cold.
Drain all pipelines.
Loosen all pipework.
Latent material:
Open the cover of the LATENTO XP and remove the solid latent material.
(Disposing of the latent material: the latent material can be disposed via normal
domestic waste.)
Drain the LATENTO XP via the lower connection nozzle.
Take back or disposal
In case your buffer storage tank LATENTO XP should be disposed of, we kindly ask
you to give the solar stratified storage tank LATENTO XP to a suitable recycling
facility. In addition, we offer you to take back the LATENTO XP for recycling if it is
delivered free of charge to our address.
25

Publicité

Table des Matières
loading

Produits Connexes pour IVT LATENTO XP 300

Ce manuel est également adapté pour:

Latento xp 500Latento xp 1000

Table des Matières