Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7. Commissioning

Verify the following check list before commissioning the LATENTO XP.
Start running the LATENTO XP only then when you can answer all questions
with "yes".
Has the container been sufficiently filled with water?
Has the stainless steel heat exchanger (boiler circuit)
been correctly connected?
Is the pipework complete and correct acc. to the
installation proposal?
Are the heating circuits filled and bled?
Are all temperature sensors installed at the right position
and connected to the regulation unit?
Is the storage tank cover attached and closed tight?
When using the electrical heating element:
Is this element screwed tight in the cover and has been
connected by an expert?
Have all connection pipes and fittings been insulated
conforming to standards?
Are pumps and heat generators connected to the regulation
unit correctly?
24
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No

Publicité

Table des Matières
loading

Produits Connexes pour IVT LATENTO XP 300

Ce manuel est également adapté pour:

Latento xp 500Latento xp 1000

Table des Matières