Installation Instructions - Haier WDNS32BW Guide De L'utilisateur

Masquer les pouces Voir aussi pour WDNS32BW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

English

INSTALLATION INSTRUCTIONS

1. Remove all packing materials. This includes the foam base and all adhesive
tape holding the accessories inside and outside.
2. Inspect and remove any remaining packaging, tape and printed material
before turning on the water dispenser.
Note: Allow the water dispenser to stand in an upright position for at least
12 hours before turning on the power.
PROPER LOCATION
• To ensure that your water dispenser works at the maximum efficiency it was
designed for, you should install it in a location where there is proper air
circulation and electrical connections.
• The following are the recommended clearances around the water dispenser.
Sides
Back
• Do not install your water dispenser in any location that is not properly
insulated or heated because the unit is not designed to operate in room
temperature below 55˚F / 13˚C. The water dispenser is for indoor use only.
Room temperature should not exceed 97° F / 36° C.
Note: Thermostats maintain the hot and cold water temperatures
automatically. On the compressor cooled water coolers the hot water
temperature will be between 190˚-203˚ F/ 88˚- 95˚ C and the cold
water temperature will be between 43˚- 50˚ F/ 6˚-10˚ C.
• Select a suitable location for the unit on a hard even surface away from
direct sunlight and heat sources (e.g., radiators, baseboard heaters, cooking
appliances, etc.).
CAUTION: DO NOT plug in the water dispenser until full bottle is
Note: Hot and cold water will not be instantly available as the unit will need
time to heat up and cool down the water.
PREPARATION BEFORE FIRST OPERATION
Before connecting the unit to the power source, Let it stand upright for
approximately 12 hours. This will reduce the possibility of a malfunction in the
cooling system from handling during transportation.
The water dispenser is pre-cleaned at the factory but the reservoir and water
lines should be flushed with fresh water before use as follows:
1. Do NOT plug in the water dispenser.
2. Check and make sure the drain cap on the back of the water dispenser is
firmly closed.
5
2" (50mm)
4" (100mm)
installed first and water flows from both Hot and Cold
water faucets.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Wdns115bw

Table des Matières