REPLACE THE BASE GRILLE
7
Replace the grille by installing the two Phillips-
head screws.
SET THE CONTROLS
8
Set the controls to the recommended setting.
Installation Instructions
31
START THE ICEMAKER
9
Set the icemaker power switch to the ON
position. The icemaker will not begin to operate
until it reaches its operating temperature
of 15°F (–9°C) or below. It will then begin
operation automatically. It will take 2–3 days
to fill the ice bin.
Power
Switch