Dometic GROUP WAECO PerfectView M70IP Instructions De Montage Et De Service page 35

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 43
PerfectView M70IP
z Check beforehand that there is sufficient space on the other side for the drill head to
come out (fig. 2, page 4).
z Bear in mind the weight of the monitor. Provide reinforcement if necessary (larger
washers or plates).
z Make sure you can lay the connection cable to the monitor.
Choosing the installation location (fig. b, page 7)
➤ Slide the monitor (1) onto the monitor bracket (2) and secure it with the knurled
screw (3).
➤ Position the monitor with the attached monitor bracket provisionally.
➤ Mark the outlines of the corners of the monitor bracket (2) on the dashboard.
➤ Unscrew the monitor from the monitor holder.
I
NOTE
You can fasten the monitor bracket using adhesive or screws.
Sticking the monitor bracket onto the dashboard (fig. c A, page 7)
➤ Remove the film from under the monitor bracket.
➤ Stick the monitor bracket to the position of your choice.
Screwing the monitor bracket onto the dashboard (fig. c B, page 7)
➤ Hold the monitor bracket within the outlines marked beforehand.
➤ Mark four drilling points.
➤ Drill the holes, with ∅ of 2 mm, at each of the markings.
➤ Screw the monitor holder on using 4 x 20 mm self-tapping screws.
Fastening the monitor
➤ Set the monitor on the monitor bracket and secure it with the knurled nut (fig. b,
page 7).
EN
Installing the LCD monitor
35

Publicité

Table des Matières
loading

Table des Matières