Step 6. Insert a temporary nail into
the top hole to the right and left of
the spillway opening. Use the nails to
puncture through the liner and hold it in
place.
Step 7. Add the face place on the outside
of the spillway and liner to secure the liner
to the spillway. Carefully install all screws
into the face plate. Lastly remove the
temporary nails and replace with the last
two screws.
NOTE: Do no use a power drill to
complete this step.
Step 8. Add the tubing adapter to the
hole on the based of the spillway by using
the coupler and the gasket on the interior
of the spillway and the tubing adapter on
the exterior of the spillway.
Step 9. Place the bio-balls inside the
bags into the base of the spillway.
Step 10. Place the filter pad over the bio-
balls.
Step 11. Attach the clips to the cover by
sliding into place and clip the cover to the
top of the spillway.
Step 12. Connect a pump to the spillway
by connecting tubing to the outlet of the
waterfall pump and the tubing adapter on
the inlet of the waterfall spillway. Use a
hose clamp if desired.
Disguise the spillway with rocks or natural
materials for a professional look. Add
water to pond basin where the waterfall
pump is located.
NOTE: Tubing, hose clamp, and waterfall
pump are not included.
Step 13. Connect the pump into a
properly grounded electrical outlet.
NOTE: Pump is not included.
4
VISIT WWW.SMART-POND.COM FOR PRODUCT INFORMATION AND TIPS.
6
Temporary nail
7
8
Spillway
9
Bio-balls
10