2.
mounting facades
pic 1
2
1
pic 2
pic 4
pic 5
pic 6
•
After the installation of the sealing parts
(see: manuel: Sealing part), remove the
protection plates (pic 1)
•
Identify the two outputs at the back of the
parts to be sealed (pic 2) :
The output 1 with a foam (filter) represents
the air tube. Place it above the water level,
in the open air (pic 2)
The output 2 allows the passage of the
piezo cable. The latter must connect the
electrical box to the piezo button.
Tip: To facilitate assembly of the piezo button,
insert a wire (electrical or other) through the pipe
until it reaches the junction box. Use this thread as
a «needle» to guide the piezo control through the
pipe (pic 4)
•
Use the heat-retractable sheath to cover the
sleeves of electrical connections (pic 5)
•
Heat the sheath to retract it (pic 6)
•
Fit the fronts onto the parts to be sealed
•
Assemble using the M5 screws
10
cas commande électrique
N
otice balNeo duo mix