Lelit PL41LEM Mode D'emploi page 6

Masquer les pouces Voir aussi pour PL41LEM:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 9
DESCRIPTION:
1.
\
2.
Cup warmer
3.
\
4.
Steam/hot water knob (on the right side)
5.
Filter holder retaining ring
6.
Steam/hot water arm
7.
Removable water drainage tray
8.
Filter holder
9.
Single cup filter
10.
Two cup filter
11.
On/off lever switch
USER INSTRUCTIONS:
Starting of the machine:
1.
Remove the machine from its packing and make sure all packing parts have been taken off (including the
protection bags).
2.
Lay the machine on a flat and steady surface far away from hot places and from the water taps.
3.
Remove the water tank cover (19) placed on the top of the machine and take out the water tank paying
attention not to damage the water tubes inside the tank.
4.
Fill the tank with cold water.
5.
Replace the water tank back in the machine and check that the water tubes are not bent and that the filter is
well set on one of them; reposition the tank cover (19).
6.
Plug in the machine in the mains. Make sure that the wall socket has the right voltage.
7.
Place the filter holder (8) under the brewing group (5) and turn it from the left to the right. Leave it there so
that it can get warm and it gets ready for use.
8.
Turn the machine on by pushing the on /off switch (11). The indicator light (14) comes on to confirm the
power supply.
9.
Open the steam/hot water knob (4).
10.
Position the lever switch (13) on hot water mode (middle) and push up the switch (22).
11.
When water comes out of the steam nozzle (6), let down the switch (22) and close the steam/hot water knob
(4). Position the lever switch (13) on coffee mode (down).
12.
After completing all these operations, leave the machine on.
Preparing an espresso:
13.
Check that the water tank has been filled in with water by looking at the water level indicator (20).
14.
Press the on/off switch (11): the indicator light (14) will come on. Do this operation only if the machine is off.
If it's on pass to the following point. Make sure the lever switch (13) is on coffee mode (down).
15.
As soon as the indicator light (21) comes on, the machine is ready for use. PL41LEMAUS: the indicator light
(21) goes off.
16.
Fit the single cup filter (9) or the two cup filter (10) into the filter holder (8) that has been warmed up by
leaving it attached to the brewing group as described in point 7.
17.
Fill the filter with ground coffee by means of the supplied measure spoon (16): 1+ ½ measuring spoonful (16)
= 1 coffee cup - 3 measuring spoonful (16) = 2 coffee cups. Every time you fill the filter with a spoonful of
coffee, press the coffee with the coffee press/tamper (15) before proceeding to fill it with the next spoonful
and make sure that there are no coffee rests on the filter border.
18.
Insert the filter holder (8) in the brewing group ring (5), turn it from left to right with force, and then put the
cup on the removable water drainage tray (7).
19.
Push up the coffee/hot water lever switch (22). The manometer (17) will show the reached pressure, between
8 and 14 bar.
20.
Once you get the desired quantity of coffee, push down the switch (22) again.
21.
Remove the filter holder (8) and throw away the coffee grounds. Make sure that the filter holder is clean and
reposition it in the brewing group to warm up again.
Preparing an espresso with the use of coffee pods:
22.
Check that the water tank has been filled in with water by looking at the water level indicator (20).
23.
Press the on/off switch (11): the indicator light (14) will come on. Do this operation only if the machine is off.
If it's on pass to the following point. Make sure the lever switch (13) is on coffee mode (down).
24.
As soon as the indicator light (21) comes on, the machine is ready for use. PL41LEMAUS: the indicator light
(21) goes off.
25.
Fit the pod filter (18) into the filter holder (8) that has been warmed up by leaving it attached to the brewing
group as described in point 7.
26.
Open the single packed pod and pay attention not to damage the pod.
27.
Place the pod in its filter (18).
28.
Insert the filter holder (8) in the brewing group ring (5), turn it from left to right with force, and then put the
cup on the removable water drainage tray (7).
Pagina 6
12.
On/off indicator light for coffee/hot water
distribution
13.
Coffee/hot water/steam lever switch
14.
Indicator light: machine on
15.
Coffee press/tamper
16.
Measuring spoon
17.
Manometer
18.
Filter for pods
19.
Removable water tank cover
20.
Water level indicator (on the left side)
21.
Indicator light: coffee/steam ready
22.
Coffee/hot water lever switch
English

Publicité

Table des Matières
loading

Table des Matières