Installation
Installation
WARNING!
Installation must be carried out in strict compliance with the safety regulations for mobile construction sites (Decr.Präs.Rep.
164/56 and Legislative Decree 494/96) in order to guarantee personal safety. The client and installer are legally liable. Before
use, ensure that mobile or fixed scaffolding, ladders and all personal protective equipment (safety belts and straps, etc.) comply
with the regulations and are in good condition. Use suitable slings. The installers must observe the relevant safety regulations.
If the clamping awning is to be installed on a floor higher than the ground floor, the corresponding area must be enclosed and
monitored so that nobody can stand under the suspended load. Improper installation may result in personal injury. Please read
the instructions for correct attachment of the clamping awning carefully to avoid the risk of it falling down. First of all, the
condition of the wall in which the anchorage is to be installed must be checked, especially with regard to the dynamic load of
the respective clamping awning on the basis of the intended maximum wind load.
Step 1:
Carefully remove the clamping awning from the box and remove the protective pads at the ends of the clamping awning unit.
Remove the clamping awning from the polythene bag. The total height of the fully extended awning is 3.17 metres.
First of all, determine your installation height A.
A
49
V2/2020-EM-H023