Thermolec DCC-12 Manuel D'installation page 7

Pour véhicules électriques
Masquer les pouces Voir aussi pour DCC-12:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. Ensure that the mounting is according with the information's
on the enclosure.
4. Fix the DCC with the anchors provided for the type of surface.
5. Check that the DCC is adequately fixed to the wall or ceiling.
STEP 4: CONDUCTOR CONNEXIONS
Consult the diagram on the next page for all details on the cable
connections configuration. This diagram is also found under the DCC
cover.
Current transformers (CT) installation and connections
1. Open the CT.
2. Install the CT around the main power cable of the panel.
3. Check the correct polarity on the CTs.
4. Connect the CT cables to the terminal block, provided for
that purpose, inside the DCC.
Extension of current transformers's wire
The DCC comes with 25 feet of wire. It is possible to extend the wiring
supplied with the current transformers.
Additional wire must be 300V rated, minimum 18 AWG (1mm),
4 conductors shielded twisted (ex: FT4 SHIELD. 4C FAS #18
or equivalent).
STEP 5-A: DIP SWITCH PROGRAMMING
FOR MAIN POWER SUPPLY
1. Identify the set-up section on the DCC.
2. Set up the section as per the layout corresponding to the main
power supply:
Main Circuit Breaker (Amps)
60A
30A
EV Charger
40A
(Breaker)
50A
60A
STEP 5-B: DIP SWITCH PROGRAMMING
FOR EV CHARGER (EVC)
EV Charger (Breaker)
30A
40A
Warranty automatically void if electrical power is supplied to the
DCC and the transformer is not set at the appropriate voltage.
STEP 6: START-UP
DCC power supply
1. Supply electrical power to the DCC.
2. Wait ten (10) seconds.
3. Check if the contactor is switched on.
4. Check the pilot light:
GREEN at all time: compliant installation, go to the next step.
RED: refer to the Lights code section.
7
Main power supply
70A
80A
90A 100A 125A 150A 200A
50A
60A
WARNING
I

Publicité

Chapitres

Table des Matières
loading

Table des Matières