Installation Procedure - Franklin Electric 280 355 2115 Instructions De Montage Et De Service

Le coffret de commande décrit est conçu pour fonctionner avec un moteur immergé 1 phase à 3 câbles
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 9
Disposal
Observe the local, regional and national regulations
and dispose of any control gear accordingly. This
product contains electrical and electronic componen-
ts and should be disposed of accordingly.
5.
parameters
The tables below summarize the technical attributes,
current overload characteristics, detailed capacitor
sizes and motor currents. The connector terminals
are suitable for copper (Cu) wire.
Power ratings and model numbers
Motor
Motor
Rating
Mod. No.
[kW]
0,25
214 753 ****
0,37
214 755 ****
0,55
214 757 **** 280 357 2115
0,75
214 758 **** 280 358 2115
Rated currents and wire sizing – use Copper (Cu)
Motor
Current
Rating
[A]
[kW]
0,25
2,8
0,37
4,0
0,55
5,9
0,75
7,3
Notes:
1. Nominal supply current at nominal voltage.
2. Motor starting current under nominal conditions.
3. Use external junction box for drop cable sizes
larger than 6 mm
.
2
6.

Installation Procedure

Before Installation
rating corresponds with the motor
Information!
GB
Start-
Control Box
Capacitor
Mod. No.
280 355 2115
48
65
95
Maximum
Max. Start
lead
1
Current
2
diameter
[A]
[mm
9,7
13,7
21,6
27,8
Mechanical installation
surface. (Figure B)
Information!
Electrical installation
Any electrical system such as described in this
Danger!
Danger!
Electrical wiring diagram
device are shown inside the Control Box housing. All
connections must be checked if the installation was
not commissioned by you:
1. TURN OFF AC POWER AT THE SOURCE (DIS-
]
2
TRIBUTION BOARD)
6
2. Remove the enclosure lid.
6
6
6
Warning!
3. Connect the incoming 230V AC power supply to
the control box as shown in the wiring diagram
(Figure A)
4. Connect the motor to the control box.
5. Tighten all screw terminals
6. Replace the enclosure lid
7. Turn on AC power at source (distribution board)
7. Operation
Normal operation
Control box is equipped with relay, for controlling
motor start and operation independently. No further
adjustments necessary.
Avoid mounting the equipment in
in the line of pressurized water or
other liquids. Take the necessary
environmental conditions into
consideration.
Life threatening voltage. Make
sure that nobody can switch on
the power unexpectedly while
work is being carried out.
Make sure that multiple earth-
points are avoided. Refer to the
local standards and norms for
borehole installations
Built-in capacitor can carry
dangerous voltages even after
disconnecting from grid power. Use
appropriate resistors to discharge
capacitors before servicing.
4

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

280 357 2115280 358 2115

Table des Matières