Messner UV-C 144 Watt PL Instructions D'emploi page 15

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 20
Assembly (see Fig. 1-5) The equipment will be supplied fully assem-
bled!
1.
Wall attachment is possible using 3 container drillings (e). See Fig. 2.
2.
Installation below water level is possible. See Fig. 4.
3.
For drain attachments of Ø 110 mm, the water drain connecting (d) must
be cut off. See Fig. 3.
4.
The drain connection (d) Ø 110 mm can be led back to the pond or
basin using commercial drain pipes.
5.
The drain connection (d) Ø 63 mm can be led back to the pond or basin
using a normal hose.
6.
The inlet connection (b) has an internal thread of G2" for connection to
the inlet conductor.
7.
A hose or pipe for dirty water discharge can be connected to the dirt
drain ball valve (f) with an internal thread of G1".
15

Publicité

Table des Matières
loading

Table des Matières