Hooks Installation To Rack - Gladiator GAGP24WRHY Instructions D'installation

Masquer les pouces Voir aussi pour GAGP24WRHY:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4.
Bracket holes
Drill two 3/32" pilot holes in either the top or bottom holes
of the brackets and GearTrack
NOTE: Screws can be attached to either bottom or top of the
brackets based on the preference.
6
06-Feb-2019 12:25:10 EST | RELEASED
®
Channels.
HOOKS INSTALLATION TO
RACK GEARTRACK
In some European factories the letter "W" of the part code mentioned herein will be automatically
5.
Hang desired hook
Hang desired hooks provided.
CHANNELS
®
replaced by the number "4000" (e.g. "W12345678" becomes "400012345678")

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Gasl242phbGasl182phb

Table des Matières