Hauff-Technik HRD 80-FUFA/o/u Instructions De Montage page 31

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

HRD (D)-Z-FUF/FUFA-KMB
Incorporating the fabric sheeting into the first sealing layer
Lay the cut fabric sheeting into the first sealing layer
13
while it is still wet and incorporate it into the surface.
Applying the second sealing layer
Once the first sealing layer has hardened sufficiently so
14
that it can no longer be damaged, apply the second sealing
layer up to the loose flange.
Once the second sealing layer is complete (approx. 6-8 hours),
15
check the loose flange again with a torque spanner and
tighten if necessary.
Service telephone +49 7322 1333-0
As indicated in the instructions for use, our products have been designed exclusively for in-
stallation in buildings made from state-of-the-art construction materials. We do not accept
liability for use deviating from or beyond this unless our express written confirmation has been
obtained in advance.
31
GB
Subject to changes.

Publicité

Table des Matières
loading

Table des Matières