dirna Bergstrom bycool green line COMPACT 3.0 Instructions De Montage page 23

Masquer les pouces Voir aussi pour bycool green line COMPACT 3.0:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

COMPACT 3.0
Place the console using original screws and
12
align in the Compact in the most ideal position,
until the original screws coincide in their
location.
Fasten supports tightening nuts until outside
13
EPDM joint of equipment is compressed,
between 3 and 6 mm.
Important: To avoid water from filtering inside
cabin, check EPDM joint tightening with
Compact base, as indicated on diagram.
3-6mm.
Cabin roof
Fasten selflocked nut until
EPDM gasket is
compressed between 3 and
13
6 mm.
Tighten (4) M8 nuts to support and (4) to Unit
14
base.
EPDM gasket
10 mm*
(*) (approx. after tightening)
Air conditioning for vehicles
12
Base
Bracket
23
Check compression
thickness using a
tape measure in the
four corners.
EPDM gasket
EN
13
14

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bycool green sérieCompact 3.0

Table des Matières