dirna Bergstrom bycool green line COMPACT 3.0 Instructions De Montage page 22

Masquer les pouces Voir aussi pour bycool green line COMPACT 3.0:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

COMPACT 3.0
EN
Position the interior air distribution panel on the
10
front studs with (1) M6 wide-rimmed washer
and (1) M6 nut on each stud. Tighten the nuts
until the foam duct comes up against the unit's
upper foam.
Important: The rubber ducting must being
run into the upper rubber of the unit to
avoid air leaks.
10
EPDM
Gasket
Cabin roof
Upholstey
Tighten the nut in point 9a until it comes up
11
against the top part of the interior air distribution
panel.
11
EPDM
Gasket
Cabin roof
Upholstey
Unit base
D
Nut M6
Stud M6
Unit base
Nut M6 (9a)
Nut M6
Stud M6
Rubber ductings
Rubber ductings
22
Air conditioning for vehicles
Foam
Interior air distribution
panel
Foam
Interior air distribution
panel

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bycool green sérieCompact 3.0

Table des Matières