Weka Holzbau 513.2020.24.00 Notice De Montage page 5

Table des Matières

Publicité

- GB -
Preface
Dear customer
Thank you very much for choosing a weka product.
Read these instructions through completely before assembling your product in order to avoid errors in
assembly or damage.
IMPORTANT
Please use the enclosed packing list to check immediately that your weka product has been
delivered complete and intact.
Please do not dispose of the packing list before the guarantee period has expired. This list enables you to
check that all the individual parts are present. It should be retained along with the proof of purchase. Any
complaints which may arise can probably be easily rectified with this list. The item numbers on the packing
list do not correspond to the item numbers in the following assembly instructions.
We recommend that 2 people carry out the assembly.
In order to prevent accidents, we recommend that children are kept out of the direct vicinity during assembly.
We reserve the right to make further technological developments. This means that there many be minor
deviations in the illustrations.
Please do not simply throw away the packaging material. Paper, card and corrugated board as well as
plastic packaging materials should be placed in the correct collection containers.
Special information
Wood
The wall elements comprise carefully selected Nordic spruce, with the interior panelling constructed from a
special wood with low heat conductivity. Healthy knots, light discoloration and small cracks are characteristic
of the wood, lending the cabin its natural appearance. They are therefore not grounds for complaint.
Prior to assembly
A minimum room height of 240 cm is required to set up the cabin. The wall clearance should be at least
5 cm.
The floor must be level and horizontal, as otherwise it may cause functional interference.
The best location for your cabin would be a dry, well ventilated room.
A stone or tiled floor is both a practical and an attractive floor covering.
Safety tips
Do not place any objects on the sauna furnace – THERE IS A FIRE RISK!
Before the heating phase begins, ensure that no flammable objects are located in the vicinity of the furnace.
Only use the sauna infusion concentrate in diluted form. Information on correct usage can be found on the
containers.
Do not use any chemical adhesives inside the sauna. Only wood glue may be used.
After using the sauna, leave the door open to allow it to cool down. Ensure that the room in which the sauna
is located is well ventilated.
The information plate pos. 66 is to fixed in a clearly visible position near the sauna furnace.
Maintenance
We recommend that you treat the exterior of the sauna with beeswax.
The interior requires no treatment.
The interior wall boarding should not be covered or allowed to come into contact with moisture.
After using the sauna, leave the door open to allow it to cool down.
Ensure that the room in which the sauna is located is well ventilated.
If the sauna is not used for long periods of time, we recommend that the door is kept open.
Stubborn stains on the wood can be removed with emery paper.
Installation of the electrics
The electrics may only be installed by a qualified electrician in accordance with the VDE and EVU guidelines.
Information on assembly of the sauna furnace and the control device can be found in the enclosed assembly
instructions.
Technische Änderungen vorbehalten!
4
© copyright weka Holzbau GmbH Neubrandenburg

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

513.2020.34.00

Table des Matières