Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5. MAINTENANCE

Maintenance and adjustment schedule were developed to enable the generator in the best working
condition.
To carry out the maintenance checks, as the schedule below, you must turn off the engine.
Maintenance schedule
Repair it within a specified month or hour (they are optionally)
Periodic
maintenance
Project
an examination
Engine oil
Replace
an examination
Air filter
an examination
Muffler Anti-Fire
Cleaning-Adju
Spark plug
Fuel sediment
bowl
Cleaning-Adju
Starting rope
Fuel tank and
filter
Fuel line
an examination
Note: (1)Normal maintenance intervals;
(2)Use in heavily polluted areas, please regular inspection and maintenance
(3)Regular maintenance schedule above is calculated according to the ambient temperature of
25 ℃, if the ambient temperature exceeds 30 ℃, please respective load power or shorten the
oil change intervals (two optional one operation) to reduce the generator.
Each use
time (1)
Clean
Clean
stment
Clean
stment
Clean
Warning
Per month
Every 3
or 20
month or
hours
50 hours
○(2)
Every two years [If necessary, change (3)]
22
Every 6
Per year or
month or
300 hours
100 hours
○(3)
○(3)

Publicité

Table des Matières
loading

Produits Connexes pour CGM SUPERPOWER 2200I

Table des Matières