Installation Steps - Welltime Summer Instructions D'installation

80/90
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation steps

Step 1
- Alignment of height-adjustable feet with spirit level.
- Slightly carve off concrete in siphon area, if necessary.
Step 2
- P ress the flat seal from above into the drainage outlet, press siphon body [7] from below onto the
drain and fasten tightly with the drainage valve [6] from above.
- Connect the sewage hose to the siphon body [7] and connect with in-house sewage system.
- Insert cleaning bit [5], press the cover [4] on.
Step 3
- The tub is to be aligned with vertical walls in a 90 degree angle by means of a spirit level.
- The joints are to be filled with silicone. Select type of silicone in accordance with construction
material used. Please mind curing times.
Allow 24 hours for silicone
to dry before first use.
Max. 150 kg
- 15 -
24
hours

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

7599165601945674978101312051354

Table des Matières