Important information
Regarding the mounting instructions
These mounting instructions come as part of the Duravit
product and should be read carefully prior to installation.
Explanation of the key words and symbols
CAUTION
NOTICE
Link to the installation information in this
section
Inspection (e.g. for scratches)
Inspect to check for leaks and tightness
Target group and qualification
The toilet must be installed by certified plumber.
NOTICE
Local installation regulations and any country-specific
standards must be observed at all times.
Safety information
CAUTION
Personal injury or breakage through fragile product.
> 2 people are recommended of handling.
> Handle with care.
NOTICE
Risk of product damage. Overtightening may cause
breakage or chipping of vitreous china.
> Handle with care.
Risk of external leakage.
> Do not lift or rock the bowl after placement.
> If you break the watertight seal, you must install a new
wax seal.
4
MAL_51358/17.04.2
At high risk of fatal hazards or
serious injuries
In the case of potential damage
to property
Water installation
HET (high efficiency toilet): 1.28 gpf / 4.8 Ipf
Operation pressure:
Recommended: 25 – 80 psi / 172 – 550 kPA
Installation information
Please read pre-installation datasheets prior to the
installation. These are available to download on the
Internet at www.duravit.us.
2
Turn off water (Diagram 2)
> Make sure water is turned off before working on
unit.
3
Install carrier (Diagram 3)
> Install carrier according to the carrier mounting
instruction.
8
Install flush valve (Diagram 8)
> Install the flush valve according to the
manufacturer's instructions.