Télécharger Imprimer la page

Würth 1952 003 320 Traduction Des Instructions De Service D'origine page 13

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 7
DE
GB
INTRODUCTION
FR
It is compulsory to read this instruction manual before starting any
kind of action. The proper operation and full compliance of this
NL
product's performance is guaranteed only if all the instructions
provided in this manual are closely adhered to.
ES
We guarantee that this product complies with the technical
specifications described in this manual. The manufacturer shall
not be held responsible for any improper uses other than those
IT
described herein. Use protective work gloves, protective footwear,
hard hat and safety goggles.
PT
Misuse:
-
This product should only be used as described in this
documentation; any other use is considered improper.
PL
-
The manufacturer accepts no responsibility for any
damage caused by the incorrect or unreasonable use of
DA
the equipment.
-
Moreover, misuse shall also void the warranty.
EL
Take care of your tools:
-
Be sure to store your tools in a clean state.
-
Place the tools inside their original package.
Modular tool set for removing and inserting bearings and for
inserting hubs.
Suitable when hub and bearing are not integrated but separated.
This tool set can also be used in combination with the removal and
insertion tool set of hubs/bearings, silent blocks, etc.
Manual application with M20 screw (included in the tool
set) or with 17-ton hydraulic cylinder – 43-mm stroke
WÜRTH code 1952 004 090 (cylinder not included in the tool set
– long screw is required).
WHEEL BEARINGS REMOVAL
Identify all the required pieces and assemble the tools as follows:
- Measure the inner and outer diameter of the bearing
- Identify the appropriate bearing pressure ring
.
B
• Diam. of pressure ring
• Diam. of centring bearing
- Mount the selected tools (
(fig. 1).
METHOD OF PREPARATION
centring ring
A
= bearing outer diameter
A
= bearing inner diameter
B
and
) on the adapter (
A
B
1
C
2
Slot for monitoring
progress of operations
3
)
C
WHEEL BEARING
PRESSURE
RING
CENTRING
A
B
A
+
B
+
C
13

Publicité

loading