3
Installation
3.1
Opening the units
3.1.1 To open the outdoor unit
1
Remove 1 screw from the service cover.
2
2
2
Remove the service cover.
3.2
Mounting the outdoor unit
3.2.1 To prepare the installation structure
If the unit is installed directly on the floor, prepare 4 sets of M8 or M10
anchor bolts, nuts and washers (field supply) as follows:
INFORMATION
The maximum height of the upper protruding part of the bolts
is 15 mm.
(mm)
In order to guarantee good operation of the unit in areas with risk of
snowfall, a minimum of 10 cm needs to be assured below the bottom
plate of the unit. It is recommended to construct a pedestal with the
same height as the maximum snowfall height. On this pedestal it is
then recommended to install the SockelBSR08 option kit to
guarantee the minimum space of 10 cm below the bottom plate of the
unit.
BelariaS04~08A3
Hoval BelariaSRM
4PW74445-1A – 2012.11
1x
1
4 211 845 / 00 – 11/12
b
(mm)
a Maximum snowfall height
b SockelBSR08 option kit
If the unit is installed on brackets to the wall, it is advised to use the
SockelBSR08 option kit and to install the unit as follows:
b b
(mm)
a Maximum snowfall height
b SockelBSR08 option kit
3 Installation
Installation manual
2