Additional Safety Instructions; Technical Data - Dexter power 3906115953 Traduction Des Instructions D'origine

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

20
Roadworthy compressors for building site opera­
tions
Make sure that all lines and fittings are suit­
able for the maximum permissible operating
pressure of the compressor.
21
Place of installation
Set up the compressor on an even surface.

ADDITIONAL SAFETY INSTRUCTIONS

Safety instructions for working with com-
pressed air and blasting guns
• The compressor pump and lines can become very
hot during operation. Touching these parts will burn
you.
• The air which is sucked in by the compressor
must be kept free of impurities that could cause
fires or explosions in the compressor pump.
• When releasing the hose coupling, hold the hose
coupling piece with your hand. This way, you can
protect yourself against injury from the rebound­
ing hose.
• Wear safety goggles when working with the
blow­out pistol. Foreign bodies or blown off parts
can easily cause injuries.
• Do not blow at people with the blow­out pistol
and do not clean clothes while being worn. Risk
of injury!
Safety information for paint spraying
• Do not process any paints or solvents with a
flash point below 55° C. There is a risk of explo­
sion!
• Do not heat up paints or solvents. There is a risk
of explosion!
• If hazardous liquids are processed, wear protec­
tive filter units (face guards). Also, adhere to the
safety information provided by the manufacturers
of such liquids.
• The details and designations of the Ordinance on
Hazardous Substances, which are displayed on
the outer packaging of the processed material,
must be observed.
• Additional protective measures are to be under­
taken if necessary, particularly the wearing of
suitable clothing and masks.
• Do not smoke during the spraying process and/
or in the work area. There is a risk of explosion!
Paint vapors are easily combustible.
• Never set up or operate the equipment in the
vicinity of a fire place, open lights or sparking
machines.
• Do not store or eat food and drink in the work
area. Paint vapors are harmful to your health.
• The work area must exceed 30 m
ventilation must be ensured during spraying and
drying. Do not spray against the wind. Always
adhere to the regulations of the local police au­
thority when spraying combustible or hazardous
materials.
24
GB
and sufficient
3
• Do not process media such as white spirit, butyl
alcohol and methylene chloride with the PVC
pressure hose. These media will destroy the
pressure hose.
Operating pressure vessels
• You must keep your pressure vessel in good
working order, operate the vessel correctly,
monitor the vessel, carry out necessary mainte­
nance and repair work immediately and meet the
relevant safety precautions.
• The supervisory authority may enforce essential
control measures in individual cases.
• A pressure vessel is not allowed to be used if
it has faults or deficiencies that can endanger
workers or third parties.
• Check the pressure vessel for signs of rust and
damage each time before using. Do not use the
compressor with a damaged or rusty pressure
vessel. If you discover any damage, then please
contact the customer service workshop.
Do not lose these safety instructions.

6. TECHNICAL DATA

Mains connection
Motor rating W
Operating mode
Compressor speed min
-1
Pressure vessel capacity
(in liters)
Operating pressure
Theoretical intake capacity
(l/min)
Protection type
Weight of the unit in kg
Max. altitude
(above mean sea level)
S3 25%: Intermittent mode, no start­up, no braking
(cycle duration 10 minutes) In intermittent mode, the
percentage load factor (25%) is always quoted so
that the heat generated during this period can be
dissipated during breaks in operation by convective
cooling. Intermittent mode consists of the on time
and the cooling breaks, known as the duty cycle.
The period of consideration is 10 minutes. 25 % load
factor means that the electric tool can be operated
for 2.5 minutes at the rated performance, followed
by a cooling phase of 7.5 minutes.
230 V ~ 50 Hz
1500
S3 25%
3750
50
approx. 10 bar
approx. 180
IP20
22
1000 m

Hide quick links:

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ac50v

Table des Matières