EN
4.1 Mounting
4.1.1 Mounting location
Ensure that the mounting location satisfies the following requirements:
X
• Mount in a dry, dust-free indoor room.
• Mount upright on the wall (concrete) on a non-flammable substrate.
• The mounting location must be protected from unauthorized access, espe-
cially by small children.
• Minimum clearance of approx. 10 cm above and below to allow free air circu-
lation.
4.1.2 Mount the PAx4 parallel switch box
Unscrew the 2 screws in the grey cover (A).
X
Press the cover upwards and detach.
X
Mark and drill 2 holes at intervals of 95 mm (Ø 6 mm).
X
Insert the dowels and screw in the M5 screws (B). Do not screw tight yet!
X
Hang the parallel switch box on the two screws and tighten the screws.
X
725.259 | Z04 | 2013-09-23
19