CAC30KW / CAC50KW : following accessories are supplied in the shipping carton.
Fig.2
To assemble the heater, proceed as follows (see Fig. 2):
1、insert the wheel shaft J to the corresponding hole of feet pipe E,insert the cotter
K to the corresponding holes; put plain washer I to the two sides of shaft, slide the
wheel H over the wheel shaft J,screw the nut G to fix the wheel on the shaft.
2、Put the heater body on the feet pipe assembly, make sure the 4 holes of handle A
point towards the corresponding 4 holes on the feet pipe respectively.
3、Using the screw B ,spring washer C, plain washer C and nut 4 to fix the feet pipe
assembly and handle to the tank.
5.
INSTALLATION INSTRUCTIONS
Position the heater on a flat, level, non-
flammable, solid surface.
Direct-fired heaters are intended for use in
outdoor open areas or in indoor well
ventilated areas. For indoor use, provide
permanent ventilation openings of at least 25 cm²/kW, equally
distributed between floor and high level, with a minimum of 250 cm².
Minimum Opening Size
CAC20KW
CAC30KW
600 cm²
800 cm²
Pos.
Description
A
Handle
B
Screw
C
Spring washer
D
Plain washer
E
Feet pipe
F
Nut M5
G
Nut M12
H
Wheel
I
Plain washer ø12
J
Wheel shaft
K
Cotter
CAC52KW
1250 cm²
Qty
1
8
8
8
1
8
2
2
2
1
2
42