Important - GE Monogram ZGG300LC Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation
Instructions
2-Drawer
Storage
18-9/16"
ZX18DS
10-1/8"
18"
1-1/4" Drawer
Overlap
17-1/4"
17"
18-3/16"
24-1/8"
25-3/16"
2 Mounting
Screws
1-1/4" Drawer
Overlap
ZX18DS STORAGE DRAWER
IMPORTANT: The supplied rear support bracket
adjusts from 4-1/8 " to 6-7/8 " . When using the
supplied bracket, cut the opening at least 4-1/8 "
above the floor. If the opening is closer to the floor
of the enclosure, use another means of support for
the back of the drawer.
The rear support must be capable of supporting
50 lbs., plus load.
• Cut the opening to the dimensions shown. Reinforce
the inside of the opening using at least 1 " wide
material surround to accept the frame-mounting
screws.
NOTE: If you are installing another accessory into
the same enclosure, measure and cut the openings
to accommodate the bottom overlaps and align
them evenly across the bottom.
• Adjust the bracket height with screws (provided) so
that the drawer cabinet will be level with the cutout.
• Slide the drawers into the opening.
• Open the top drawer. Locate the screw holes in the
top of the drawer cabinet, just inside the drawer.
Install 2 screws (not provided) to secure the drawer
to the enclosure.
Side View
21
Rear Support Bracket
4-1/8" to
6-7/8"

Publicité

Table des Matières
loading

Table des Matières