Installation and commissioning
1. Install the socket
enclosed sealing plate
2. Connect the 9V block battery
Ý
to the battery connection
and insert the battery into
battery bracket.
3. Stick the smoke detector
into the socket and lock it by
turning slightly clockwise.
Caution: If no battery is
inserted, the smoke detec-
tor cannot be fixed in the
socket.
4. Carry out a function test
(Page 32).
¿
Smoke detector
¡
Socket
¬
Sealing plate
Ð
Plug
ƒ
Screw
Ý
Battery (9V)
ý
Test button
¡
with the included installation material. Lay the
¬
between the base and the room ceiling.
¿
GB
29