Operating The Nailer; Nail Loading - Interchange CRN4500 Manuel D'utilisation

Table des Matières

Publicité

CRN4500
Item No. 65690
DOOR
DOOR
LATCH
6
1
2
3
4
1
■ Always follow the tool manufacturer's safety and
!
maintenance instructions.
■ Always wear safety glasses with side shields when
operating or servicing tools.
■ Always disconnect the air supply from the tool and empty
the magazine when servicing tools.

OPERATINg ThE NAILER

NAIL LOADINg

OPEN ThE MAgAZINE
ƒ Pull down the door latch. Swing door open. Swing
magazine cover open.
ChECK ADjUSTMENT
ƒ The nail support platform can be moved up and down
to four settings. To change setting, pull up on the post
and twist left or right to the correct step. The nail support
should be adjusted correctly to the position indicated in
inches and millimeters inside magazine.
ACTUAL NAIL LOADINg
ƒ Place a coil of nails over the post in the magazine.
Uncoil enough nails to reach the feed pawl and place the
second nail between the teeth on the feed pawl. The nail
head fits in slot on feeder pawl and into the nose.
SWINg COVER CLOSED
CLOSE ThE DOOR
ƒ Check that the latch engages. ﹙If it does not engage,
check that the nail heads are in the slot on the feeder
pawl﹚.
POST
WARNING!
Interchange Brands Coil Nailers: Operator's Manual
2

Publicité

Table des Matières
loading

Table des Matières