Télécharger Imprimer la page

Yale PCHLV136SS Guide D'utilisation, D'entretien Et D'installation page 7

Publicité

Installation
Prepare location
• It is recommended that the vent system be installed before
hood is installed.
• Before making cutouts, make sure there is proper clearance
within the ceiling or wall for exhaust vent.
• Check your ceiling height and the hood height maximum
before you select your hood.
• Disconnect power.
• Determine which venting method to use: roof, wall, or
nonvented.
• Select a flat surface for assembling the range hood.
Place covering over that surface.
WARNING
TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK, OR
INJURY TO PERSONS, OBSERVE THE FOLLOWING.
1 Using 2 or more people, lift range hood onto covered
surface.
Mounting the duct cover bracket
2 Determine and mark the centerline on the wall where the canopy
hood will be installed. Disconnect power.
3 Select a mounting height between a minimum of 24" (61 cm) for
an electric cooking surface, a minimum of 30" (76.2 cm) for a gas
cooking surface, and a suggested maximum of 36" (91.4 cm)
above the range to the bottom of the hood. Mark a reference line
on the wall.
4 Tape template in place, aligning the template centerline and
bottom of template with hood bottom line and with the centerline
marked on the wall.
A.
Centerline
B.
Fastener locations
C.
Mounting height reference (hood bottom line)
4 Mark centers of the fastener locations through the
template to the wall.
IMPORTANT: All screws must be installed into wood. If there is
no wood to screw into, additional wall framing supports may be
required.
5 Remove the template.
6 Drill
/
" (4.8 mm) pilot holes at all locations where screws are
3
16
being installed into wood.
7 Install the 2 - 5 x 45 mm mounting screws. Leave a
gap between the wall and the back of the screw head to slide
range hood into place.
/
"
1
4
(6.4 mm)
A
C
B
/
" (6.4 mm)
1
4
Vent cover bracket installation
1 Attach vent cover bracket to wall flush to the ceiling using
2 - 5 x 45 mm screws.
A.
B.
C.
Install framing for hood support
• If drywall is present, mark the screw hole locations.
• Cut away enough drywall to expose 2 vertical studs at the
holes location indicated by the template.
Install two horizontal supports at least 4 x 2" between two
wall studs at the bottom and upper mounting holes
installation location.
• The horizontal support must be flush with the room side
of the studs.
• Use cleats behind both sides of the support to secure to
wall studs.
• Reinstalll drywall and refinish
IMPORTANT- Framing must be capable of supporting 100 lbs.
Centerline of
installation
space
Complete preparation
1 Determine and make all necessary cuts in the wall for the
vent system. Install the vent system before installing the
hood. See "Venting Requirements" section.
2 Determine the required height for the home power supply
cable and drill a 1
/
" (3.2 cm) hole at this location.
1
4
3 Run the home power supply cable according to the
National Electrical Code or CSA Standards and local codes and
ordinances. There must be enough
fused disconnect (or circuit breaker) box to make the connection in
the hood's electrical terminal box.
NOTE: Do not reconnect power until installation is complete.
4 Use caulk to seal all openings.
A
B
C
Ceiling
Wall
Centerline
8½" min. opening for ductwork
View from rear
cleats
1" x 6" min
Mounting Support
/
" conduit and wires from the
1
2
7

Publicité

loading