13.1
13.2
E
13.3
E
All manuals and user guides at all-guides.com
These holes on top .
G
E
H
G
G
H
G
Step 13
13.1 L ay (E) on the floor with the middle
hole towards upward as illustrated.
13.2 Lay (G) and (H) with the holes shown
towards upward as illustrated.
13.3 Insert (E) and (F) into (G) X2 and (H)
as illustrated.
the threaded hole
in the middle
towards upward .
F
B34407144900
20