Installation Guide
Perform network test
When the Danfoss Link™ HR has
been added to the Danfoss Link™
CC Central Controller, a network test
should be performed .
For more information on network
tests, see the Danfoss Link™ CC
instruction manual:
Configuration 8:
Perform network test .
Factory reset
Trouble shooting
Green LED ON
Red LED ON
Green LED fast flash
Red LED short flash
Note: If the fuse has burned you can replace it with the spare
fuse, located in the fuse holder .
8
Danfoss Link™ HR
1 . Hold both install buttons in front
of the device for approx . 5 sec . until
LED gives a red flash .
Relay OFF/Standby
Relay ON/Heating
Inclusion or link test
Inclusion not OK
Link test not OK
VISGX45X
© Danfoss
04/2011