Télécharger Imprimer la page

OW Lee CASUAL FIRESIDE 51-09 Mode D'emploi page 12

Masquer les pouces Voir aussi pour CASUAL FIRESIDE 51-09:

Publicité

CONVERTING YOUR FIRE PIT TO A DIFFERENT GAS TYPE
1.
MAKE SURE THAT THE GAS SUPPLY TO THE FIRE PIT (AND ANY NEARBY ELECTRICAL
SOURCES/APPLIANCES) ARE SHUT OFF.
2.
Carefully detach the flex line connector hose attached to the orifice holder (Figure # 1) and unscrew the orifice
holder from the burner pipe (Figures #1 and # 2).
3.
Remove the orifice from the holder (Figure # 2 ) and replace it with the proper sized one for your gas requirement.
Propane requires the smaller orifice.
4.
If you are converting from propane (LP) gas to natural gas, install the air shutter sleeve so that the air intake holes
are closed (Figure #2). For Propane gas, remove the air shutter so that the air intake holes are open (Figure #1).
After the unit is assembled for use, it is requires a "leak check" test on all connections are before placing
the unit in operation.
5.
IT IS NECESSARY TO ATTACH THE LABEL OR RATING PLATE INCLUDED WITH THE CONVERSION KIT TO
CLEARLY INDICATE THE FIELD CONVERSION.
Burner
Orifice
Air Intake hole open for LP Gas
Burner
Orifice
When converting to natural gas, the air shutter 
sleeve MUST be installed over the burner pipe.
MANUFACTURER'S USE ONLY - QUALITY CHECK
Orifice # (Main)
Orifice # (OTHER)
Leak Test
Burn Test
Gas Type
FIGURE 1
Orifice Holder
FIGURE 2
Orifice Holder
#45
#25 / COM0580CK
LP - NAT
Flex Line
Connector Hose
THE CONVERSION SHALL BE CARRIED OUT
BY A MANUFACTURER'S AUTHORIZED
REPRESENTATIVE, IN ACCORDANCE WITH
JURISDICTION AND IN ACCORDANCE WITH
CAN/CGA-B149.1 OR CAN/CGA-B149.2
Flex Line
Connector Hose
After The Unit Is Converted, it Must Be
Tested to Verify the Inlet and Manifold
pressures are as specified on Page 3.
Additionally, the authorized representative
must verify that the input rate of the
converted appliance match the rate listed
below.
Work Order #
BTU Rating
Serial #
Model #
Air Shutter
Inspector:
Page 12
Casual Fireside Fire Pits Are
Suitable For Installation from
0 - 4,500 ft. Without Modification.
Follow steps 1 – 5 shown above.
THE REQUIREMENTS OF THE
MANUFACTURER, PROVENCIAL OR
TERRITORIAL AUTHORITIES HAVING
THE REQUIREMENTS OF THE
INSTALLATION CODES.
After conversion follow Operating
Instructions found on Page 11.
Date
LP 47,500 / NG 56,000
COM0580
X

Publicité

loading