H-10909, H-10910
URINAL PARTITION
TOOLS NEEDED
Electric
3/16" Drill Bit
5/16" Drill Bit
Drill
Partition x 1
NOTE: Before installing the urinal screen
components, determine the correct location
for application.
1.
Draw a plumb line on the wall to mark the urinal
screen center line. Measure from the floor and
place marks on the urinal screen center line at
18" and 54". (See Figure 1)
2. Position and center brackets at each mark and
urinal screen center line. Using the bracket as a
template, mark the screw hole locations on the
wall. Remove the bracket and drill a 5/16" hole
(minimum 2" deep) at each hole location.
(See Figure 1)
3. Insert plastic anchors in all holes and secure
brackets to the wall with the #14 x 2" screws
provided. (See Figure 1)
4. Ensure there is a 12" gap from the bottom of the
urinal screen to the floor. Insert it into the wall
brackets until a 1" gap between the wall and urinal
screen is established. (See Figure 1)
5. Using the bracket as a template, drill 3/16" holes
through the urinal screen at each bracket hole.
Secure the urinal screen to the brackets with the
#14 x 5/8" screws provided. (See Figure 1)
PAGE 1 OF 3
1-800-295-5510
uline.com
Phillips Head
Phillips
Drill Bit
Screwdriver
Bracket x 2
Plastic Anchor x 4
INSTALLATION
Two Person Assembly
Recommended
PARTS
#14 x 2" Screw x 4
Figure 1
Plastic Anchor
1" Gap
Bracket
#14 x 2"
Screw
#14 x 5/8"
Screw
Para Español, vea página 2.
Pour le français, consulter la page 3.
#14 x 5/8" Screw x 8
12"
Floor
Center Line
54"
18"
0723 IH-10909