23
Door to install
Galvanized pipe of upright post to
24
install
Left door (label bottom left L)
Left door
(label bottom left L)
B-6L
Right door (label bottom right R)
Galvanized pipe
GS0101062
30×30×1893
5 pcs
The galvanized pipe has already been
placed in the upright post. If drop out,
please install it here.
Align the inner pipe of the wall
connecting column with the wall
connecting column and place it
vertically.
57
Right door
(Label bottom right R)
B-6R
Do not install screws on four-corner
column and wall panel. After the main
body is assembled, screw it uniformly.
Use screws M5x20 x8 pcs
ENGLISH