Télécharger Imprimer la page

United States Stove VOGELZANG TR007E Mode D'emploi page 8

Publicité

FACTORY BUILT CHIMNEY
When
a
metal
prefabricated
manufacturer's installation instructions must be followed. You
must also purchase (from the same manufacturer) and install
the ceiling support package or wall pass-through and "T"
section package, firestops (where needed), insulation shield,
roof flashing, chimney cap, etc. Maintain proper clearance
to the structure as recommended by the manufacturer. The
chimney must be the required height above the roof or other
obstructions for safety and proper draft operation.
chimney
is
used,
MASONRY CHIMNEY
Ensure that a masonry chimney meets the minimum
standards of the National Fire Protection Association
(NFPA) by having it inspected by a professional. Make
sure there are no cracks, loose mortar or other signs of
deterioration and blockage. Be sure to the chimney
cleaned before the stove is installed and operated.
When connecting the stove through a combustible wall
to a masonry chimney, special methods are needed.
-8-
the

Publicité

loading