OPERATION PROCEDURE
STEP 1
Take the documents Put into the thermal cover and put in order neatly.
Especially at the top and bottom of the seal.
STEP 2
1.Turn on the power switch, the heating indicator light and the 1 minute button
indicator light up, and start preheating.
2.Wait for the end indicator to light up and hear the buzzer, the preheating is
complete.
3.Wait the Run lamp lighting, take the thermal cover put into the worm trough.
- 4 -