Télécharger Imprimer la page

Water Furnace TruClimate 100 Manuel D'installation page 6

Publicité

10-15 TON HYDRONIC HEAT PUMP INSTALLATION GUIDE
Dimensional Data
120-180 - Top Waterline Configuration
33.60
WATERLINES
2.26
LOW VOLTAGE
(7/8" KNOCKOUT)
LINE VOLTAGE
(1-3/8" KNOCKOUTS)
120-180 - Back Waterline Configuration
33.59
2.16
17.00
LOW VOLTAGE
(7/8" KNOCKOUT)
LINE VOLTAGE
(1-3/8" KNOCKOUTS)
2.96
25.58
FRONT
CONTROL BOX
5.82
BACK LOCATION
5.28
BACK
2.26
21.07
24.01
OPTIONAL LOW
VOLTAGE
(7/8" KNOCKOUT)
25.58
FRONT
BACK
WATERLINES
2.16
21.06
24.01
OPTIONAL LOW VOLTAGE
(7/8" KNOCKOUT)
LOAD
2' ALTERNATE
SERVICE ACCESS
12.11
CONTROL BOX
FRONT LOCATION
CONTROL BOX
LOAD
2' ALTERNATE
SERVICE ACCESS
12.11
6
OPTIONAL
TOP WATER
CONNECTIONS
2'
PRIMARY
SERVICE
ACCESS
CONTROL BOX
SOURCE
14.05
12.11
10.18
2'
PRIMARY
SERVICE
ACCESS
SOURCE
14.05
12.11
10.18

Publicité

loading

Produits Connexes pour Water Furnace TruClimate 100