ASSEMBLY INSTRUCTIONS
1.
Install new floor bolts into floor flange. You can pre-cut
the floor bolts to the desired length to put on the bolt
cap by doing the following:
Temporarily install floor bolts and set the toilet and place
the washers and nuts onto the bolts. Then mark the
length needed. Take toilet out of the place and remove
the floor bolts. Cut the floor bolts to the length and then
turn the toilet upside down onto a soft surface to avoid
scratches on the finish.
Hardware Used
JJ
Floor Bolts Kit
2. Place a new wax ring around the waste flange of toilet
bowl.
Hardware Used
LL
Sealing Ring/Wax Ring
3. Lower the toilet onto the floor bolts, so the bolts project
through mounting holes in base of toilet. Using a rocking
motion, press the bowl down to position the toilet onto the
flange.
x 2
FIG 2
x 1
G 3
FIG 3
FIG 4
6