Télécharger Imprimer la page

Ultratech 0E-24PGIGUN Mode D'emploi page 5

Publicité

Troubleshooting
Make sure the equipment is installed according to the manufacturer's installation guide.
Confirm RJ45 cable order meets EIA/TIA 568A or 568B standard.
Replace the equipment with a proper functioning 24 Port Network Switch to check
if the equipment is damaged.
Please contact UltraTech Support at 833-574-9124, or contact the installing company.
Plug Producing Method
Instruments to be used: wire crimper, network tester and wire sequence of RJ45 plug
should conform with EIA/TIA568A or 568B.
1. Please remove 2cm of the insulating layer and bare 8 pairs UTP cable.
2. Separate the 8 pairs of UTP cable and straighten.
3. Line up the 8 pieces of cables per EIA TIA 568A or 568B.
4. Cut off the cables to leave 1.5cm bare wire.
5. Plug 8 cables into RJ45 plug make sure each cable is in each pin.
6. Use the wire crimper to crimp.
7. Repeat above steps to make additional ends.
8. Use network tester to test the cable.
1 White/Green
2 Green
3 White/Orange
4 Blue
5 White/Blue
6 Orange
7 White/Brown
8 Brown
EIA/TIA 568A
Notice
When choosing an RJ45, ensure that if one end is EIA/TIA568A, the other end is also EIA/TIA568A.
When choosing an RJ45, ensure that if one end is EIA/TIA568B, the other end is also EIA/TIA568B.
24 Port Gigabit Unmanaged Ethernet Switch
1 White/
Orange
2
Orange
3 White/Green
4 Blue
5 White/Blue
6
Green
7 White/Brown
8 Brown
EIA/TIA 568B

Publicité

loading

Produits Connexes pour Ultratech 0E-24PGIGUN