1
X
2
X
3
X
4
5
X
Characteristic load values
With joint tape, reduce the
milling depth by the thickness
of the joint tape.
Position WALCO® Z32
drilling template (with end
stop) at marking X and
pre-drill with Ø 5 mm.
3.+5. screw connection:
with 2 pcs. CS 8 x 50mm
screws each
6. assemble:
Bring the walls together
vertically offset by
approx. 70mm and
lower them until the
edges of the two walls
are flush.
in direction of the fibre
perpendicular to the fibre
tension
6
X
X