Télécharger Imprimer la page

Portfolio Outdoor Dual Brite PF-4300-BK Mode D'emploi page 3

Publicité

instaLL universaL mounting
Bracket
Estimated Installation Time: 30 minutes
Items needed for installation (not included):
• Phillips and flathead screwdrivers
• Pliers
• Wire strippers/cutters
• Safety glasses
• Light bulb
• Silicon caulk
For best performance, mount the fixture at least
8 feet (2.4 m) above the ground.
warning: turn power off at circuit
breaker or fuse.
1. Tighten the two fixture screws finger tight.
2. Attach universal mounting bracket to junction
box securely with the two screws provided.
598-1169-05
Junction Box
Universal Mounting
Bracket
Junction Box Screw
Fixture Screw (Tightened
Finger Tight)
wiring Light Fixture
1. Connect the junction box wires and the fixture
wires together as shown in the following dia-
grams.
caution: Do not remove wire connec-
tor from reD wire or connect the reD wire
unless you want to control other lights from
this motion sensor fixture.
2. Twist and secure wires with wire nuts.
Note: If you have a metal junction box use the recom-
mended grounding method shown in the following
illustration. If you are uncertain about the grounding
method, consult your local building code.
Bare Ground Wire
Ground Screw
Pigtail (not
supplied)
Fixture Bare
Ground Wire
recommended grounding method
3
Metal Junction
Box
white to white
Black to Black

Publicité

loading

Ce manuel est également adapté pour:

022246