Maximum surface exposed to wind
2
Assembly options
Two-module assembly
(only available in
24 and 36 LED models)
Installation
Necessary tools (not included):
Torque wrench with hex sockets 4 and 5
1.
Anchor wall arm/support to the
light.
1a.
Wall support
1b.
Arm support. Horizontal anchor
1c.
Arm support. Vertical anchor.
M8 (C) screws. Tightening torque:
is recommended to ensure it is set.
2.
Light connection to electrical cable
Clamping of the power cable to the
TH391(A) IP68 plug socket connector,
properly tightening the screws.
In the event that the sealed connector
is not placed, another method
must be used that guarantees the
watertightness of the connection to
the power line.
3.
Arm anchor to pole
M8 (B) screw. Tightening torque:
14Nm.
measurements upon request)
recommended to ensure it is set.
DECLARACIÓN DE CONFORMIDAD/REGISTRO EPREL
EPREL DÉCLARATION DE CONFORMITÉ/REGISTRE EPREL DICHIARAZIONE DI CONFORMITÀ/BANCA DATI EPREL KONFORMITÄTSERKLÄRUNG/EPREL
REGESTRIERT
0.0308 m
2
+15°
*
*
-15°
Pole in horizontal position
Rotation with arm
Adjustable in 5° increments.
Flat-head screwdriver
c+d+e
1a
1b
A
DECLARATION OF CONFORMITY/EPREL REGISTRY
FÖRSÄKRAN OM ÖVERENSSTÄMMELSE/EPREL-REGISTRERAD
2
-25º
Pole in vertical position
Rotation with arm
Adjustable in 5° increments.
-50º
Key 17
(only for wall support)
1a
c+d+e
c+d+e
1c
B
2
DECLARAÇÃO DE CONFORMIDADE/REGISTO
https://doc.televes.com
Max. 0.096 m
2
+15°
-15°
1b
1c
3