IMPORTANT-Read through entire instructions before beginning any installation.
Determine where the Hyloft 36" x 36" unit will be installed, such as in a pantry, bedroom, laundry room,
closet or garage. (If installing above the open garage door you will need at least 17" of open space
between the highest point of door and the ceiling as measured during its upward travel.)
Map out the ceiling area of the room where you are installing your unit. Locate the ceiling joists in the
area of desired installation and determine the direction in which they are running. In order to
adequately disperse the stored load, you should install not more than three HyLoft 36" x 36" units on
any two ceiling rafters (joists, roof trusses, etc.). IMPORTANT: The opposite and adjacent ceiling Bent
Downrods must be installed in line with each other so that the four Downrods form a perfect square.
Refer to the diagram below or photos on the package for additional installation clarification.
finder locate joists
Ceiling Joist
1A
1A. Attach 1st Ceiling Downrods (C) into Ceiling Joist.
Use Sinker Nail in center hole to hold in place and test that it is in the joist.
Pre-drill 3/16" holes for 2 Lag Screws (G). Use a 7/16" Socket Wrench or Nut Driver to
install two of the 1/4 x 2 ½" Lag Screws (G)
Locate another joist from 24" to 32" away. Install the 2nd Downrod (C) making sure it
is perfectly in line and square with the 1st Downrod.
1B. Measure 36 ½" along the stud from the outside edge of the bent Downrod to locate
the outside edge of the opposite Downrod, or use the holes in the Crossbars (B)
as a template to locate the screw hole locations for the opposite Downrod. Mark with
pencil. Repeat for final Downrod.
INSTALL DOWNRODS TO CEILING STUDS
Using Stud/joist
24" to 32"
apart
Sinker Nail-CHECK THAT THIS ENTERS JOIST
Measure
36 ½" from
outside edges of
downrods or use
holes in support bar
as a template
1B
Mark with
pencil
90
o
IMPORTANT:
Downrods must
be perfectly
square (90 degrees)
& in line with each
other