3. Installation
WARNING: Qualified personnel only
Instructions
1. Mount wall bracket (for top holding) of the battery charger, make
sure it is level.
2. Install three screws.
3. Open cover by removing four screws, on front bottom cover.
4. Put charger on mounting bracket and mark the Bottom of the
two (M6-D-holes) mounting holes.
5. Install M6 screws.
6. Install AC cord to input terminal strip marked E, N, L, be sure to
use the correct size wire (per ABYC regulations) to use for the
input current marked on the label of charger.
7. Cut DC inlet plugs to cable size, then connect battery cables to
DC lugs marked +DC & -DC. The -DC is used common for all
three batteries. If there are less than three batteries, pick any +DC;
all are capable of full current load. Select appropriate size wire
(per ABYC regulations).
8. Select battery type by pushing the appropriate dipswitch at
bottom left corner of board.
Note: This unit is selected for GEL; if you change battery type
DESELECT GEL, (See Figure 1).
Important: Centaur models 12/200, 24/80 and 24/100 are fitted
with 2 boards that operate in parallel. The dipswitches on both
boards should be in the same position to ensure that both boards
follow the same charge curve.
9. Replace top cover and reinstall four screws on cover.
10. Apply power and verify Green Led is on (bottom left of PC
board, look through bottom left air vents).
6